INTECH Group is honoured to be entrusted as the contractor for the M&E (Mechanical and Electrical) and ventilation systems for the Foster factory. The project’s objective is to create a controlled environment that supports the production process by maintaining necessary cleanliness levels, thereby ensuring product performance and quality as per the brand’s standards.
In addressing the investor’s requirements, INTECH Group implemented a structured process comprising:
- Evaluated the current state of the factory and identified the specific requirements to develop a comprehensive design plan.
- Developed detailed technical drawings and implementation plans to ensure feasibility and optimal efficiency.
- Install the systems as planned, followed by rigorous testing to ensure that the systems operate effectively and meet the highest quality standards.
We sincerely thank INNOX Vietnam for their trust and cooperation throughout the project implementation, as well as our partners for their support.