Clean room is one of the essential requirements for factories, production workshops,….,for example, electronics factories, pharmaceutical, food processing factories, …., in order to ensure standard production processes and produce the best quality products. The construction of clean rooms is an important step in the process of building factories, hospitals, …..
Contact usHow is the clean room installed?
For hospitals, clean rooms are often used for operating rooms, sample storage rooms, emergency recovery rooms, etc.
Depending on the industry, there are different standards and there are different clean standards. The installation and construction of a clean room depends on the standards required by the investor and the machinery layout of the production room.
- TCVN: 14644 – ISO: ISO 1 – ISO 8 with decreasing cleanliness level Federal Standard 209: Class1. class 10. class 100. class 1000. class 10,000. class 100,000 with decreasing cleanliness level
- GMP: A, B, C, D with decreasing cleanliness level applied to clean room in pharmaceutical, drug,…
To make a clean room, it is necessary to have experienced engineers and experts because each standard and each ground has different requirements and construction plans. Contact INTECH Group immediately for a free consultation.
* Some reference parameters in clean room
– Humidity standard: Average humidity from 50% (difference of approximately 10%) for human safety, however areas with less human presence can be as low as 18%.
– Dust standard: According to the photo above according to the standards
– Standard Pressure: The pressure is from 15 to 45 PA, most cleanrooms are under positive pressure, that is, the pressure is higher than outside to limit contamination from outside.
Clean room standards need to be strictly guaranteed, meet standards so that production processes do not affect product quality and factory operation. Therefore, it is necessary to have an experienced and highly specialized unit to consult, design and construct clean rooms.

FIELDS NEED CLEANROOM
With a team of experienced staff, INTECH provides a full package of clean room services for all fields and sizes: Clean room system design consulting, Upgrading, renovating clean rooms, Supplying equipment Clean room, Warranty, clean room maintenance, Operation support, clean room measurement.

Electronics, Semiconductor, Automotive, High-tech
These are areas with strict requirements for standards, specifications, and accuracy. Factories in this field need a clean room to ensure product quality and meet output requirements. Electronic clean rooms will usually follow ISO14644-1, Federal Standard 209 E,…

Pharmaceuticals, cosmetics, veterinary drugs, medical equipment
The level of cleanliness in the field of Pharmaceuticals and cosmetics needs to comply with GMP standards with a number of requirements on factories and equipment, factory hygiene control, processing control (materials, operations) production,…), transportation and storage of finished products, etc.

Hospital operating room, IVF room, tissue bank
At the hospital, the surgical area and especially the operating room are considered as the heart of the work, to ensure the number of dust particles and sterility to perform the surgery. Clean room standards of hospital operating rooms in Vietnam are at ISO level 7 and may be higher depending on room requirements.

Food and other field
Food is also an industry with strict requirements on product output standards. In particular, in the production process, the level of dust, bacteria, temperature, humidity, etc. should be strictly controlled. Normally, in Vietnam, food clean rooms follow GMP or ISO standards.
In addition, there are many other specific areas that need clean rooms to ensure other product quality.
ABOUT US
250+
Electronics Project
90+
Pharmaceutical and cosmetic projects
50+
Hospital and medical projects
50+
Food project, other field
Basic steps to build a clean room
Clean room construction time depends on the size of the clean room, usually done in a short time because this is the completion stage of the work. With each customer request, INTECH gives optimal advice on design, cost and completion time for the project. The following is the process of implementing clean room construction at INTECH:
Step 1:
Consulting and surveying
Receiving information requested from customers, the project engineer team will conduct preliminary consultations with customers’ inquiries. Next, survey the clean room installation area. In order to be able to advise on the most suitable option, INTECH technicians and engineers will directly measure the parameters, learn the actual environment of the area.
Step 2:
Design a standard clean room quote
In order to ensure the required standard, factors such as structure, area, air circulation level, pressure, temperature and humidity … will be considered to give a detailed clean room design. The design, clean room quote is discussed and agreed with the customer. Items and equipment will be clearly quoted.
Step 3:
Show equipment samples to customers
Clean rooms need strict standards, so equipment and materials to create clean rooms also need to be met, and specialized types are used. Submit samples of materials to customers, ensure the specifications and the two parties will agree before starting construction.
Step 4:
Construction of electronic clean room
INTECH’s clean room construction department will receive the requirements from the agreed drawings and proceed with construction. The construction team needs to comply with strict requirements in construction and labor safety to ensure the tightness, pressure, and standards on the amount of dust in the room according to the standards. Besides, the construction progress is guaranteed as agreed.
Step 5:
Inspection and acceptance
INTECH and customers will conduct inspection and verification of aesthetic related issues and technical conditions are guaranteed to ensure that the cleanroom of electronic components is put into use. After the test is completed, the project will be handed over to the customer for use.
Step 6:
Warranty and maintenance
Cleanrooms usually need to be checked and inspected once every 12 months to ensure standards. INTECH Service is our specialized maintenance team, always ready to support customers immediately with problems that occur during operation so that the quality of the clean room can be guaranteed to operate in good conditions.
With many years of experience in the clean room field, INTECH has implemented many clean room projects in many fields such as pharmaceuticals, electronics, food, hospitals…. from North to South with many required standards. INTECH is very honored to be selected by many domestic and foreign partners such as Japan, Korea, China, Europe, America, etc. to carry out major projects. Here are some of the projects INTECH has implemented: